Аннотация
The article presents various cases of defects in road construction within the city, the likelihood of which is easily possible with proper control over the construction process. At the same time, using the example of the city of Kutaisi, it is presented in a timely manner, and therefore in some cases it has sharply decreased, and in some cases the possibility of unhindered movement on roads with high traffic intensity has been created. a specific direction of the city, which made it difficult to unload a number of streets from traffic flow and effectively use recreational resources in the suburbs in a specific direction of the city.
Библиографические ссылки
N. Garcia-Chan, L.J. Alvarez-Vazquez, A. Martinez, M.E. Vazquez-Mendez
Designing an ecologically optimized road corridor surrounding restricted urban areas: A mathematical methodology
Mathematics and Computers in Simulation, 190 (2021), pp. 745-759,
Highways England, Design manual for roads and bridges, CD 127 - Cross-sections and headrooms, (2021)., Retrieved from https://www.standardsforhighways.co.uk/prod/attachments/10442706-b592-42c8-85f8-2a0c779a8e37?inline=true (Accessed date: August 2022)
მ.ბარათაშვილი. საავტომობილო გზის საიმედობის უზრუნველყოფის შესაძლებლობები. მეხუთე ქართულ–პოლონური საერთაშორისო სამეცნიერო ტექნიკური კონფერენცია. „სატრანსპორტო ხიდი ევროპა–აზია“ შრომები.15–18.10.2019.
Это произведение доступно по лицензии Creative Commons «Attribution-NonCommercial-NoDerivatives» («Атрибуция — Некоммерческое использование — Без производных произведений») 4.0 Всемирная.
Copyright (c) 2024 Georgian Scientists