Asphalt Concrete Preparation and Placement Monitoring

Authors

  • Nina Areshidze Georgian Technical University
  • Badri Churchelauri Georgian Technical University
  • Diana Tevzadze Georgian Technical University
  • Eliko Kobauri Georgian Technical University

DOI:

https://doi.org/10.52340/building.2026.73.01.04

Keywords:

asphalt concrete, quality, monitoring, placement, compaction, bitumen, mineral powder, filler, aggregate, temperature

Abstract

Asphalt concrete quality depends on many factors, each of which can have a decisive impact on the strength and durability of the road surface. Therefore, adherence to optimal process conditions and well-established monitoring at all stages of raw material preparation, placement, compaction, and structure formation guarantees the stability of asphalt concrete.

Downloads

Download data is not yet available.

References

1. A. Chikovani. Building Materials. GTU, 2019

2. M. Dzidziguri. Road Building Materials, GTU, 2005.

3. L. Klimiashvili, D. Gurgenidze, A. Chikovani. Concrete Science. GTU, 2021.

4. Yudin A.P. Bitumen-Bearing Road Construction Materials. Rostov-on-Don, 2018.

5. Ivlieva L.V., Ignatova O.A. Binders and Binding Materials Based on Them for Road Construction. Moscow. ASV, 2019.

Published

2026-07-01

How to Cite

Areshidze, N., Churchelauri, B., Tevzadze, D., & Kobauri, E. (2026). Asphalt Concrete Preparation and Placement Monitoring. Scientific-Technical Journal "BUILDING", 1(73). https://doi.org/10.52340/building.2026.73.01.04

Issue

Section

Articles

Similar Articles

<< < 1 2 3 4 > >> 

You may also start an advanced similarity search for this article.