River Rioni and sediment management process of reservoir Rion Hpp
DOI:
https://doi.org/10.52340/building.2025.71.07Keywords:
Low-threshold reinforced concrete dam, Output channel, sediment management of reservoir, Washing the reservoirAbstract
In 1927, construction of the Rioni Hydroelectric Power Plant began on the Rioni River near Kutaisi.The article discusses the construction processes of the Rioni hydroelectric dam and hydropower station, as well as the problems associated with it. The processes of sediment formation at the Rioni hydroelectric power station and the associated problems of hydroelectric power station operation are studied. The paper presents data from field observations and measurements during the process of dredging and flushing of the reservoir.
Downloads
References
Noselidze D.V. Shautidze O.D. Complex study of water resources of the Rioni River ∕ ∕Proc. Int. Scientific-practical. Conf. Perm 2007. Pp. 152-15.
STATE WATER CADASTRE. ANNUAL DATA ON THE REGIME AND RESOURCES OF LAND SURFACE WATERS. Georgian SSR. Part 1. Rivers and canals, Part 2. Lakes and reservoirs 1985. Volume VI. OBNINSK. VNIIGMI-MCD —1987.